Migrating Deployed Jobs and schedules From a TAC to Another

Four Stars

Migrating Deployed Jobs and schedules From a TAC to Another

Hi,

 

i have the following scenario:

TAC 6.3.1 on server1 no GIT/SVN attached -->TAC1

TAC 6.3.1 on server2 no GIT/SVN attached -->TAC2

same db version.

can somebody please explain in detail how to migrate all jobs and schedules from TAC1 to TAC2?

 

Thanks,

 

Luca

 

Moderator

Re: Migrating Deployed Jobs and schedules From a TAC to Another

Hello,

Could you please have a look at this user guide to see if it is what you are looking for?

https://help.talend.com/reader/zG7iZ5VB0XkesgeKP4qk_A/TQgsIcqA5inHH8DgfjbslQ

Best regards

Sabrina

--
Don't forget to give kudos when a reply is helpful and click Accept the solution when you think you're good with it.
Four Stars

Re: Migrating Deployed Jobs and schedules From a TAC to Another

Hi,

 

i was trying to apply that solution, but it seems to work only if i have SVN on all environment.

Without svn attached no poroject is listed in the mogtration check function.

 

I have to migrate from Production TAC to Test TAC both without SVN/GIT. I only have GIT repositotory attached to the Developement Environment that is not involved in this migration.

 

I'm not able to apply that solution or i'm missing something.

Is there another way?

 

Thanks for reply.

 

Luca

 

2019 GARNER MAGIC QUADRANT FOR DATA INTEGRATION TOOL

Talend named a Leader.

Get your copy

OPEN STUDIO FOR DATA INTEGRATION

Kickstart your first data integration and ETL projects.

Download now

What’s New for Talend Summer ’19

Watch the recorded webinar!

Watch Now

The Forrester Wave: Strategic iPaaS and Hybrid Integration Platforms, Q1 2019

Find out how Forrester rate different iPaaS and Hybrid Integration Platforms

Read

Definitive Guide to Data Quality

Create systems and workflow to manage clean data ingestion and data transformation.

Download

Tutorial

Introduction to Talend Open Studio for Data Integration.

Watch