how can I create a sequence job to run jobs sequentially

Five Stars

how can I create a sequence job to run jobs sequentially

Hi,

I have created 10 parallel jobs. Now I need to create a sequence job to run all these parallel jobs in sequential flow (one after another). How can I achieve this?

I tried to create a sequence job and used tRunjob to call all these jobs and execute, but it failed in the first step only with the message: "Parameter can't be null".

All the parallel jobs are running fine if executed independently. Any help is appreciated.

 

 

Tamil vellum. Thanks.

Employee

Re: how can I create a sequence job to run jobs sequentially

Hi,

 

    Could you please share a screen shot of the current components arrangement in your studio so that we will get more idea about your use case?     

 

Warm Regards,

 

Nikhil Thampi

Five Stars

Re: how can I create a sequence job to run jobs sequentially

Capture.PNG

Forteen Stars

Re: how can I create a sequence job to run jobs sequentially

@Gohan,are you passing the context to tRun job,if not please pass that context parameter

Manohar B
Don't forget to give kudos/accept the solution when a replay is helpful.

2019 GARNER MAGIC QUADRANT FOR DATA INTEGRATION TOOL

Talend named a Leader.

Get your copy

OPEN STUDIO FOR DATA INTEGRATION

Kickstart your first data integration and ETL projects.

Download now

What’s New for Talend Summer ’19

Watch the recorded webinar!

Watch Now

Best Practices for Using Context Variables with Talend – Part 1

Learn how to do cool things with Context Variables

Blog

Migrate Data from one Database to another with one Job using the Dynamic Schema

Find out how to migrate from one database to another using the Dynamic schema

Blog

Best Practices for Using Context Variables with Talend – Part 4

Pick up some tips and tricks with Context Variables

Blog