context information in log when using "transmit whole context"

One Star

context information in log when using "transmit whole context"

Hi,
I have a master job with the 'transmit whole context' option checked.
All works fine, the context is well transmitted, but in the log table (idem in volumetrics and statistics tables) the context column is fed with the context of the child job, not the context of the father job which is transmitted.
It sounds like a bug.
Do you observe the same behaviour ?
Talend 4.0
Regards
One Star

Re: context information in log when using "transmit whole context"

Nobody noticed the same problem ?
One Star

Re: context information in log when using "transmit whole context"

Nobody noticed the same problem ?

We have the same problem in 5.2.2.
It transmits the right context to the subjob if "transmit whole subjob" is checked. It writes with the statsCatcher component the context to the log table that is configured next to the job name (which is not transmitted if the "transmit whole subjob is checked") => so I would say this bug has it third birthday by now.