Six Stars

Upgrade from 5.5 to 6.1

Hello

I am new to Talend. Would you please help me here. Currently we use Talend 5.5 and in the process of migrating to 6.1.

I took an existing job which pull data from a table and creates file. I thought this would be simplest job which i can test on Talend 6.1.

1. I imported the job in 6.1

2. Window -> Preferences -> Talend -> Debug/Run -> Remote 

    I entered my current production server name

 

When i ran the job from 6.1 i used above server, because i have configuration files with the environment variables.

I am getting below errors. Can you tell me what should be steps in migrating from 5.5 to 6.1. 

 

Checking ports...

 

Sending job 'Data_Extract_Vertica_MBS_HBI_FTP' to server (talend3-01.bo3.e-dialog.com:8001)...

 

File transfer completed.

 

Deploying job 'Data_Extract_Vertica_MBS_HBI_FTP' on server (10.100.5.55:8000)...

Execution failed : java.io.IOException: The remote server has closed the connection, if the remote JobServer is 5.x the monitoring port is required, please ensure you the monitoring port configured for host '10.100.5.55' is reachable, else upgrade your JobServer 5.x to 6.x could avoid this issue.

[The remote server has closed the connection, if the remote JobServer is 5.x the monitoring port is required, please ensure you the monitoring port configured for host '10.100.5.55' is reachable, else upgrade your JobServer 5.x to 6.x could avoid this issue.]

 

 

1 REPLY
Fifteen Stars

Re: Upgrade from 5.5 to 6.1

Were you trying to run a Job from the 6.1 Studio on a Remote 5.5 Jobserver? That is what it looks like. You should be testing it on a Remote 6.1 Jobserver.

 

Also, 6.1 has been retired. It's end of life is Jan '19. How are you not migrating to a later version? 

Rilhia Solutions