How to get the status of a Job run (success or failure) etc.

One Star

How to get the status of a Job run (success or failure) etc.

In TOS or runing the Job out side of TOS, How to get the status of a Job run (success or failure) etc?
Also, How can we sequence the Jobs.. ie, I need to execute Job B after a sucesss of Job A etc.,
Thanks
One Star

Re: How to get the status of a Job run (success or failure) etc.

for your second question you can create a third job that call the job A and after the job B with a trigger link OnsubjobOK
One Star

Re: How to get the status of a Job run (success or failure) etc.

thats that is wonderful
One Star

Re: How to get the status of a Job run (success or failure) etc.

Plese anybody provide me how to get the job status if the job is successful or failed......java and perl project
One Star

Re: How to get the status of a Job run (success or failure) etc.

Please help provide a way to get a job run status running outside of TOS 2.3.1
Employee

Re: How to get the status of a Job run (success or failure) etc.

If the job success, the return code is 0. If the job fails, the return code will be anything but 0.
 /tmp/export1/topic2470_failure
$ bash topic2470_failure_run.sh
The worksheet "first sheet" does not exist in this Excel book, existing worksheets are {}
/tmp/export1/topic2470_failure
$ echo $?
2
/tmp/export2/topic2470_success
$ bash topic2470_success_run.sh
1
2
3
/tmp/export2/topic2470_success
$ echo $?
0

What’s New for Talend Spring ’19

Join us live for a sneak peek!

Sign up now

Definitive Guide to Data Quality

Create systems and workflow to manage clean data ingestion and data transformation.

Download

Tutorial

Introduction to Talend Open Studio for Data Integration.

Watch

Downloads and Trials

Test drive Talend's enterprise products.

Downloads