Hi Talend Folks,

 

I have scenario for TAC schedule.I have three different kind of talend job. Job name is demo_1, demo_2 and demo_3 .
Demo_1 job scheduled in TAC at 4 clock.
Suppose Demo_1 job is failed.
Need to run Demo_2 job in TAC.
Suppose Demo_2 is failed.
Need to run After half hour Demo_3 job in TAC.
Whether it's possible to schedule above scenario in TAC

Thanks
RAJ
Moderator

Re: TAC schedule scenario based

Hello,

Have you already checked talend recovery checkpoints feature? You can play around with scheduling and recovery in TAC. Do you have a master job which contains several subjobs?

TalendHelpCenter:recovery checkpoints

Best regards

Sabrina

--